Quality
Certification
& Testing.
100% electrical testing on every unit: not sampled, not batch-checked. Every harness receives continuity, hi-pot, and pull-force testing before dispatch. Every test result is documented and tied to the unit's serial number.
“Statistical sampling passes most units. In precision-critical applications, ‘most’ is not a standard we can accept. We test every unit.”
Four tests.
Every unit. No exceptions.
Continuity Testing
Every conductor in every harness is tested for continuity from end to end. Opens, shorts, and miswires are caught before the harness leaves the bench. No exceptions.
Hi-Pot (Dielectric Withstand) Testing
High-potential dielectric withstand testing verifies insulation integrity under elevated voltage. Required for harnesses operating in high-voltage or safety-critical environments.
Pull-Force Testing
Crimp terminations are pull-force tested to IPC-A-620 Class 3 requirements. Results are recorded per conductor and tied to the unit serial number. Marginal crimps don't pass.
Visual Inspection
Each unit undergoes a full visual inspection against a documented inspection checklist: insulation damage, correct connector orientation, labelling, and routing. Checked against the approved first article.
Everything ships
with the harness.
Full documentation is compiled per order before dispatch. If your incoming inspection or audit requires it, we have it, and it ships with every delivery.
Request a QuoteOften paired with.
Built with Precision.
Tell us about your application. Our engineering team responds within one business day with a preliminary assessment and quote.